Viadotto Fantoli – Retrofit and Deck Replacement
client
Milano Serravalle
year
2022
location
Milan, Italy
service
Bridge Engineering


The existing viaduct before works
An existing road viaduct in Milan, upgraded to current standards with a full deck replacement and a wider carriageway, while the original piers and foundations stay in service.
MODO developed the detailed design for the static retrofit of the existing viaduct and its substructures, including demolition of the existing deck, a new steel-concrete composite deck with a widened carriageway, and seismic upgrading.

FE model of the new composite deck

Foundation plan and cross-section
Technical highlights: a new composite twin-girder deck sized for the wider roadway, load paths into the retained piers rechecked and strengthened, and elastomeric isolators to bring the structure up to seismic standards.
a glimpse at our projects
get in contact
if you have a project you would like to discuss simply fill the form below and we will come back to you as soon as possible.
Thank you! Your submission has been received!



